{"id":18632,"date":"2023-11-22T16:08:50","date_gmt":"2023-11-22T16:08:50","guid":{"rendered":"https:\/\/accs.international\/?page_id=18632"},"modified":"2026-09-07T09:00:48","modified_gmt":"2026-09-07T09:00:48","slug":"cemac-infrastructures-projets","status":"publish","type":"page","link":"https:\/\/accs.international\/?page_id=18632","title":{"rendered":"DEVELOPMENT OF TRANSPORT INFRASTRUCTURE TO FACILITATE PHYSICAL INTEGRATION"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"18632\" class=\"elementor elementor-18632\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68453c6 e-flex e-con-boxed e-con e-parent\" data-id=\"68453c6\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a8b0973 elementor-widget elementor-widget-text-editor\" data-id=\"a8b0973\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>PROJECT DESCRIPTION<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-44faebb elementor-widget elementor-widget-text-editor\" data-id=\"44faebb\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The levels of development of sections subject to phase 2 of CD13 are as follows:<\/p>\n<ul>\n<li>The Bangui-Bosseimbele section in the CAR is paved and its condition is fair<\/li>\n<li>Ihe Pokola-Gouga section in the Congo and the Bossembele-Mbaikoro section in the Car are in the state of dirt roads.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a257ccf elementor-widget elementor-widget-image\" data-id=\"a257ccf\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"312\" height=\"162\" src=\"https:\/\/accs.international\/wp-content\/uploads\/2023\/11\/WhatsApp-Image-2023-11-22-at-17.11.31_c458ccce.jpg\" class=\"attachment-large size-large wp-image-18705\" alt=\"\" srcset=\"https:\/\/accs.international\/wp-content\/uploads\/2023\/11\/WhatsApp-Image-2023-11-22-at-17.11.31_c458ccce.jpg 312w, https:\/\/accs.international\/wp-content\/uploads\/2023\/11\/WhatsApp-Image-2023-11-22-at-17.11.31_c458ccce-300x156.jpg 300w\" sizes=\"(max-width: 312px) 100vw, 312px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5b7eb0a elementor-widget elementor-widget-text-editor\" data-id=\"5b7eb0a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>THE PROJECT CONSISTS OF<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-015a027 elementor-widget elementor-widget-text-editor\" data-id=\"015a027\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<ul>\n<li>The construction and asphalting of the Pokola-Guga-CAR border (486 km, including the other developments and secondary roads to reach the remote areas) and Bossembele-Mbaikoro-Chadian border (350 km, including other developments and secondary roads to reach remote areas)<\/li>\n<li>The rehabilitation of the Bangui-Bossembele asphalt road (145 km, including other developments and secondary roads to reach remote areas) in the CAR.<\/li>\n<\/ul>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6d5db15 elementor-widget elementor-widget-text-editor\" data-id=\"6d5db15\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>OBJECTIVES<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-afa9ede elementor-widget elementor-widget-text-editor\" data-id=\"afa9ede\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The goal of the project is to contribute to the improvement of the interstate road transport system and the promotion of community exchanges. The specific goal of the project is to contribute to improving the level of service of the road transport logistics chain on the Point-Noire-Brazzaville-Bangui-N&#8217;Djamena corridor and reducing the general cost of transport as well as living conditions of people in the area.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-9795a34 e-flex e-con-boxed e-con e-child\" data-id=\"9795a34\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-68f377d elementor-widget elementor-widget-text-editor\" data-id=\"68f377d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>PROJECT COST<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d0566e6 elementor-widget elementor-widget-text-editor\" data-id=\"d0566e6\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The total cost of phase 2 of CD13 is estimated at <strong>994.572 million euros<\/strong>. As part of efforts to seek financing for phase 2 of CD13, CEMAC has already mobilized an amount of <strong>620.550 million euros<\/strong>.<\/p>\n<p>The additional funding sought to carry out all construction and upgrade works for phase 2 of CD13 stands at <strong>374.022 million euros<\/strong>.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1285adc elementor-widget elementor-widget-text-editor\" data-id=\"1285adc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><strong>PROJECT COST<\/strong><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>PROJECT DESCRIPTION The levels of development of sections subject to phase 2 of CD13 are as follows: The Bangui-Bosseimbele section in the CAR is paved and its condition is fair Ihe Pokola-Gouga section in the Congo and the Bossembele-Mbaikoro section in the Car are in the state of dirt roads. THE PROJECT CONSISTS OF The&#8230;<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-18632","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/pages\/18632","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/accs.international\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=18632"}],"version-history":[{"count":23,"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/pages\/18632\/revisions"}],"predecessor-version":[{"id":19638,"href":"https:\/\/accs.international\/index.php?rest_route=\/wp\/v2\/pages\/18632\/revisions\/19638"}],"wp:attachment":[{"href":"https:\/\/accs.international\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=18632"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}